Wealth Asia Connect Middle East Treasury & Capital Markets Europe ESG Forum TechTalk
Asia Connect
Testing underway at Hassyan clean coal-fired power plant in Dubai
Scheduled to be fully operational in 2023, plant will help diversify regional energy mix
Michael Marray   29 Jul 2020
THE No 1 generator unit of the Dubai Hassyan clean coal-fired plant in the United Arab Emirates has begun full-load trial operations, Xinhua has reported.
Forgot password?
Treasury Case Study Series